At the time of fitting to note 3 points

Nov 19, 2016

At the time of fitting to note 3
1. in carrying out fitting in accordance with the first large calibre, mains, risers, after loading in small, in charge of the principles of conduct.
2. the installation must be in accordance with the order, do not not jump Pack, segment loading.
3. the connection between segments and segment must be careful to avoid fitting connection difficulties affecting the overall performance of the pipeline.